Decision details
Haymarket Tunnel Strengthening Works – Appointment of Project Management Support
Decision Maker: Director of Capital Programmes
Decision status: Recommendations Approved
Is Key decision?: No
Is subject to call in?: No
Decision:
The Director of Capital Programmes has
approved the direct award of a contract to Turner and Townsend
Project Management Limited for £193,732 via the ESPO
Property, Building & Infrastructure Advice & Management
Services – Lot 1 for the provision of services as lead
consultant and project manager, providing project leadership,
project management and stakeholder coordination for the proposed
strengthening works to the Haymarket Tunnel, including progressing
the preferred intervention for strengthening the tunnel through
design development, stakeholder approvals and procurement process
to enable a route to delivery.
Reasons for the decision:
The Borough Yard (Hind Street) regeneration
area is a brownfield site of circa 20 hectares adjacent to
Birkenhead Town Centre. The scale and location of the regeneration
area present an opportunity to create a sustainable, market
changing urban village that helps to set a standard for future
development in the face of the climate emergency.
The regeneration of Borough Yard plays a significant role in
supporting the Council’s Local Plan by enabling up to 1600
new homes to be built during the plan period and ancillary
commercial and community uses are proposed to be located to the
north of the site to complement and interface with the regeneration
of the town centre, serving both the new residential community at
Hind Street and wider Birkenhead population.
A review of the assessment undertaken by AECOM in July 2023 of
bridges within the proposed Dock Branch Park concluded that the
Haymarket Tunnel has a 7.5-tonne assessment live loading capacity,
which is somewhat below the required 40/44 tonne capacity for
vehicular movements within the highway at this location. The
Council commissioned Mott MacDonald Ltd in April 2026 to develop
options for the strengthening of the region of the tunnel that
carries Jackson Street over the Dock Branch Line. The final report
determined the most appropriate method of strengthening along with
providing a likely cost and programme for delivery of a scheme
necessary to enable the proposed remodelling of the local highway
network and intended removal of flyovers to support future
development in Birkenhead Town Centre.
Under the ESPO Property, Building & Infrastructure Advice &
Management Services – Lot 1 framework (“the
Framework”) contractors may be selected as suppliers to
provide services to Contracting Authorities who may place orders in
accordance with the Framework. The Council, as a Contracting
Authority is able to make a direct award to Turner and Townsend
Project Management Limited (Turner and Townsend) under Criterion C
of the Framework's Call-Off Without Competition procedure.
Criterion C permits a direct award where a supplier has provided
equivalent services to the customer within the previous 12 months,
and the appointment of an alternative supplier would result in
demonstrable inefficiencies or duplication of cost.
Turner & Townsend has provided equivalent professional services
to the Council within the preceding 12 months in connection with
the wider Hind St/Borough Yard project. Through these commissions,
the consultant has developed a detailed understanding of the
project's scope, technical requirements, cost assumptions,
programme constraints, risk profile, stakeholder environment and
governance arrangements. The improvements to Haymarket Tunnel are a
key dependency to the wider Hind Street/Borough yard project and
also the future dismantling of the Birkenhead flyovers.
As the Haymarket Tunnel is currently a Network Rail asset, Turner
& Townsend will provide a dedicated Project Management function
to lead the Haymarket Tunnel Strengthening Scheme through
development, approvals and determination of suitable procurement
route on behalf of the council. A critical aspect of the commission
will be managing the project's interface with Network Rail's
approval processes, embedding technical, governance and asset
protection requirements within the delivery strategy. The outcome
of the commission will be to develop a structured procurement
strategy to assist the council in determining the most appropriate
procurement route, contract type and delivery partner for the
strengthening scheme proposed.
The cost of this commission is to be funded via a Council capital
programme allocation of £3million approved in February 2026
seeking funding for the strengthening scheme, a separate bid to the
Department for Transport Structures Fund for £4.2 million was
submitted in August 2026, an announcement of funding awards is
expected from the Department for Transport in Autumn 2026. The
overall funding package will enable the appointment of Turner and
Townsend, and the subsequent strengthening works to take
place.
Alternative options considered:
One option would be not to appoint external
specialist project management support and to look to progress a
scheme solely using internal resources. This option has been
discounted as the development of a strengthening scheme that meets
Network Rail’s required approvals process requires specialist
commercial, delivery and governance expertise along with dedicated
coordination capacity within challenging delivery timescales.
A second option would be to procure the required services through
an open competitive procurement process; however, the timescales
associated with this option would impact on the Department for
Transport Structures Fund delivery deadlines should the council be
successful in securing funding for the scheme.
Publication date: 04/11/2026
Date of decision: 04/11/2026
