Decision details

Haymarket Tunnel Strengthening Works – Appointment of Project Management Support

Decision Maker: Director of Capital Programmes

Decision status: Recommendations Approved

Is Key decision?: No

Is subject to call in?: No

Decision:

The Director of Capital Programmes has approved the direct award of a contract to Turner and Townsend Project Management Limited for £193,732 via the ESPO Property, Building & Infrastructure Advice & Management Services – Lot 1 for the provision of services as lead consultant and project manager, providing project leadership, project management and stakeholder coordination for the proposed strengthening works to the Haymarket Tunnel, including progressing the preferred intervention for strengthening the tunnel through design development, stakeholder approvals and procurement process to enable a route to delivery.


Reasons for the decision:

The Borough Yard (Hind Street) regeneration area is a brownfield site of circa 20 hectares adjacent to Birkenhead Town Centre. The scale and location of the regeneration area present an opportunity to create a sustainable, market changing urban village that helps to set a standard for future development in the face of the climate emergency.

The regeneration of Borough Yard plays a significant role in supporting the Council’s Local Plan by enabling up to 1600 new homes to be built during the plan period and ancillary commercial and community uses are proposed to be located to the north of the site to complement and interface with the regeneration of the town centre, serving both the new residential community at Hind Street and wider Birkenhead population.

A review of the assessment undertaken by AECOM in July 2023 of bridges within the proposed Dock Branch Park concluded that the Haymarket Tunnel has a 7.5-tonne assessment live loading capacity, which is somewhat below the required 40/44 tonne capacity for vehicular movements within the highway at this location. The Council commissioned Mott MacDonald Ltd in April 2026 to develop options for the strengthening of the region of the tunnel that carries Jackson Street over the Dock Branch Line. The final report determined the most appropriate method of strengthening along with providing a likely cost and programme for delivery of a scheme necessary to enable the proposed remodelling of the local highway network and intended removal of flyovers to support future development in Birkenhead Town Centre.

Under the ESPO Property, Building & Infrastructure Advice & Management Services – Lot 1 framework (“the Framework”) contractors may be selected as suppliers to provide services to Contracting Authorities who may place orders in accordance with the Framework. The Council, as a Contracting Authority is able to make a direct award to Turner and Townsend Project Management Limited (Turner and Townsend) under Criterion C of the Framework's Call-Off Without Competition procedure. Criterion C permits a direct award where a supplier has provided equivalent services to the customer within the previous 12 months, and the appointment of an alternative supplier would result in demonstrable inefficiencies or duplication of cost.

Turner & Townsend has provided equivalent professional services to the Council within the preceding 12 months in connection with the wider Hind St/Borough Yard project. Through these commissions, the consultant has developed a detailed understanding of the project's scope, technical requirements, cost assumptions, programme constraints, risk profile, stakeholder environment and governance arrangements. The improvements to Haymarket Tunnel are a key dependency to the wider Hind Street/Borough yard project and also the future dismantling of the Birkenhead flyovers.

As the Haymarket Tunnel is currently a Network Rail asset, Turner & Townsend will provide a dedicated Project Management function to lead the Haymarket Tunnel Strengthening Scheme through development, approvals and determination of suitable procurement route on behalf of the council. A critical aspect of the commission will be managing the project's interface with Network Rail's approval processes, embedding technical, governance and asset protection requirements within the delivery strategy. The outcome of the commission will be to develop a structured procurement strategy to assist the council in determining the most appropriate procurement route, contract type and delivery partner for the strengthening scheme proposed.

The cost of this commission is to be funded via a Council capital programme allocation of £3million approved in February 2026 seeking funding for the strengthening scheme, a separate bid to the Department for Transport Structures Fund for £4.2 million was submitted in August 2026, an announcement of funding awards is expected from the Department for Transport in Autumn 2026. The overall funding package will enable the appointment of Turner and Townsend, and the subsequent strengthening works to take place.

Alternative options considered:

One option would be not to appoint external specialist project management support and to look to progress a scheme solely using internal resources. This option has been discounted as the development of a strengthening scheme that meets Network Rail’s required approvals process requires specialist commercial, delivery and governance expertise along with dedicated coordination capacity within challenging delivery timescales.

A second option would be to procure the required services through an open competitive procurement process; however, the timescales associated with this option would impact on the Department for Transport Structures Fund delivery deadlines should the council be successful in securing funding for the scheme.

Publication date: 04/11/2026

Date of decision: 04/11/2026