140. |
APP/20/00653 Lawnswood, 39 QUARRY ROAD EAST, HESWALL, CH60 6RB Erection of 9no. apartments in a single block together with associated parking, landscaping, bin and cycle storage following demolition of existing dwelling PDF 1 MB
Additional documents:
Minutes:
The Corporate Director of Regeneration and
Place submitted the above application for consideration.
The Lead Petitioner addressed the
Committee
The Agent addressed the Committee
On a motion by Councillor S Foulkes and
seconded by Councillor B Kenny it was:
Resolved (14:0) That
the application be approved subject to the following
conditions:
1.
The development hereby permitted shall be begun before the
expiration of 3 years from the date of this permission.
|
2.
The development hereby permitted shall be carried out in accordance
with the approved plans received by the local planning authority on
14 March 2020 and listed as follows: OS location plan 817.01,
existing and proposed block plans 817.02, proposed site plan
817.03, proposed ground floor plan 817.04, proposed first floor
plan 817.05, proposed loft space plan 817.06, proposed front and
side elevations 817.07, proposed rear and side elevations 817.08,
proposed street scene elevations 817.09 and proposed front and side
elevations with outline of existing 817.10
|
3. Notwithstanding the submitted plans, prior to any
development above ground level approval of the following details
shall be obtained from the local planning authority;
i. Samples or details of all facing
materials including all new windows and doors
The stated details
shall be approved in writing and such approved details shall be
implemented in the development hereby approved in full
|
4. A scheme of
landscape proposals including a timetable of works shall be
submitted to and approved in writing by the Local Planning
Authority prior to first occupation of the proposed development.
The scheme shall include (where practical) but not be limited to
features such as bat and bird boxes, log piles, bug boxes, solitary
bee houses and hedgehog homes to encourage net gains in
biodiversity and full plans and specifications for all hard and
soft landscape works and indications of all existing trees and
hedgerows on the land, including those to be retained.
All planting,
seeding and/or turfing comprised in the approved details of
landscaping shall be carried out in the first planting and seeding
seasons following the occupation of the building(s) or the
completion of the development, whichever is the sooner, and any
trees, shrubs, hedges or plants which within a period of five years
from the completion of development die, are removed, or become
seriously damaged or diseased shall be replaced in the next
planting season with others of similar size and species, unless the
Local Planning Authority gives written consent to any
variation.
|
5. No site clearance, preparatory work or
development shall take place until a scheme for the protection of
the retained trees (the tree protection plan) and the appropriate
working methods (the arboricultural
method statement) in accordance with paragraphs 5.5 and 6.1 of
British Standard BS 5837: Trees in relation to design, demolition
and construction - Recommendations (or in an equivalent British
Standard if replaced) shall have been submitted to and approved in
writing by the local planning authority. The scheme for the
protection of the retained trees shall be carried out as
approved.
|
6. ...
view the full minutes text for item 140.
|
|