OUT/15/00484: Springfield, 34 GORSE LANE, NEWTON, CH48 8BH - One new Dwelling & detached Garage

Minutes:

The Strategic Director for Regeneration and Environment submitted the above application for consideration.

 

A Petitioner addressed the Committee

 

The Applicant addressed the Committee

 

A Ward Councillor addressed the Committee

 

On a motion by Councillor Realey and seconded by Councillor Daniel it was:

 

Resolved (8:5) That the application be approved subject to the following conditions:

 

1. The development hereby permitted shall be commenced before the expiration of three years from the date of this permission or two years from the date of the approval of the last of the reserved matters, whichever is the later.

 

2. Details of the reserved matters set out below shall be submitted to the Local Planning Authority for approval within three years from the date of this permission:

 

(a)  Layout

(b)  Scale

(c)  Appearance

(d)  Access and

(e)  Landscaping

 

Approval of all reserved matters shall be obtained from the Local Planning Authority in writing before any development is commenced and shall be carried out as approved.

 

3. Before any construction commences, samples of the facing/roofing/window materials to be used in the external construction of this development shall be submitted to and approved in writing by the Local Planning Authority. The approved materials shall then be used in the construction of the development.

 

4. The area(s) so designated within the site shall be suitably landscaped in accordance with a scheme to be submitted to and approved by the Local Planning Authority before any works commence on site, the landscape work to be completed during the first available planting season following completion of the development hereby approved and shall be maintained thereafter to the satisfaction of the Local Planning Authority.

 

The detailed landscaping plans shall include:

 

(i)  details of boundary treatments and hard surfaces

(ii)  the location, size and species of all trees to be planted

(iii)  the location, size, species and density of all shrub and ground cover planting

(iv)  a schedule of implementation

 

5. No development shall take place until a plan indicating the positions, design, materials and type of boundary treatment to be erected has been submitted to and approved in writing by the Local Planning Authority.  The boundary treatment shall be completed for each of the dwellings hereby approved as and when they are completed and before each relevant dwelling is first occupied. Development shall be carried out in accordance with the approved details and retained as such thereafter.

 

6. Before the development hereby permitted is first commenced, a datum for measuring land levels shall be agreed in writing. Full details of existing and proposed ground levels and proposed finished floor levels shall be taken from that datum and submitted to and approved in writing by the Local Planning Authority, notwithstanding any such detail shown on previously submitted plan(s). The development shall be carried out in accordance with the approved details and retained as such thereafter.

 

7. No development shall take place until a Site Waste Management Plan, confirming how demolition and construction waste will be recovered and re-used on the site or at other sites, has been submitted to and approved in writing by the Local Planning Authority. The approved Plan shall be implemented in full unless otherwise agreed in writing with the Local Planning Authority.

 

8. Prior to first occupation or use of the development, arrangements for the storage and disposal of refuse, and vehicle access thereto, shall be made within the curtilage of the site, in accordance with details previous submitted to and agreed in writing by the Local Planning Authority, prior to the first occupation of the building.

 

9. No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the Local Planning Authority.  The approved Statement shall be adhered to throughout the construction period. 

The Statement shall provide for:

 

i.  the parking of vehicles of site operatives and visitors;

ii.  loading and unloading of plant and materials;

iii.  storage of plant and materials used in constructing the development;

iv.  the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;

v.  wheel washing facilities;

vi.  measures to control the emission of dust and dirt during construction;

vii.  a scheme for recycling/disposing of waste resulting from demolition and construction works.

 

10. Before development takes place a scheme for the protection of the retained trees- The Tree protection plan (section 5.5, BS 5837:2012,Trees in relation to design, demolition and construction - Recommendations) shall be submitted and agreed in writing with the LPA.  This scheme shall include:

 

A.  the details of each retained tree as required at section. 4.4 of BS5837 in a separate schedule.

B.  a plan or relevant drawings, including proposed site layout plans, to a scale and level of accuracy appropriate to the proposal that shows constraints posed by existing trees (section 5.2 BS 5837), the position, crown spread and Root Protection Area (section 4.6 of BS5837) of every retained tree on site and on neighbouring or nearby ground to the site in relation to the approved plans and particulars. The positions of all trees to be removed shall be indicated on this plan.

C.  a schedule of tree works for all the retained trees in paragraphs (a) and (b) above, specifying pruning and other remedial or preventative work, whether for physiological, hazard abatement, aesthetic or operational reasons.  All tree works shall be carried out in accordance with BS3998, 2010, Tree work-Recommendations.

 

An arboricultural method statement (section 6 BS 5837) containing;

 

D.  the details and positions (shown on the plan at paragraph (a) above) of the Tree Protection Barriers (section 6.2 of BS5837), identified separately where required for different phases of construction work (e.g. demolition, construction, hard landscaping). The Tree Protection Barriers must be erected prior to each construction phase commencing and remain in place, and undamaged for the duration of that phase.  No works shall take place on the next phase until the Tree Protection Barriers are repositioned for that phase.

E.  the details and positions (shown on the plan at paragraph (a) above) of the Ground Protection Zones (para 6.2.3 of BS5837).

F.  the details and positions (shown on the plan at paragraph (a) above) of the Construction Exclusion Zones (section 6 of BS5837).

G.  the details and positions (shown on the plan at paragraph (a) above) of the underground service runs (para 5.5.6 of BS5837).

H.  the details of any changes in levels or the position of any proposed excavations within 5 metres of the Root Protection Area (para. 5.5.6 of BS5837) of any retained tree, including those on neighbouring or nearby ground.

I.  the details of any special engineering required to accommodate the protection of retained trees (section 7 of BS5837), (e.g. in connection with foundations, bridging, water features, surfacing)

J.  the details of the working methods to be employed with the demolition of buildings, structures and surfacing within or adjacent to the RPAs of retained trees (section 7 BS 5837).

 