Agenda item

APP/16/00694:Hurstwoods International Ltd, ALEXANDRA ROAD, NEW BRIGHTON, CH45 0JZ - Erection of 2 No. four-storey 80-bed residential care homes with associated external works and landscaping after demolition of existing food processing factory and associated buildings

Minutes:

The Assistant Chief Executive submitted the above application for consideration.

 

A Petitioner addressed the Committee

 

The Agent addressed the Committee

 

A Ward Councillor addressed the Committee.

 

On a motion by Councillor Elderton and seconded by Councillor Foulkes it was:

 

Resolved (12:1) That the application be approved subject to the following conditions:

 

1. The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission.

 

2. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority on 20th May 2016 and listed as follows: 1301.014 102; 1301.014 104; 1301-014 110; 1301-014 B110; 1301-014 111; 1301-014 B111; 1301-014 200; 1301-014 B200; 1301.014 210; 1301.014 300; 1301.014 400;

 

3. Before any construction commences and notwithstanding the details stated on the approved plans, samples of the materials to be used in the external construction of this development shall be submitted to and approved in writing by the Local Planning Authority. The approved materials shall then be used in the construction of the development.

 

4. Construction of the development authorised by this permission shall not begin until the Local Planning Authority (LPA) has approved in writing a full scheme of works for the construction of the new vehicle accesses from the highway and any amendments to the existing highway made necessary by this development, including details of the new vehicle crossing accesses constructed in accordance with the LPA commercial crossing specification and the reinstatement to standard footway level of any existing access from the highway rendered obsolete by the development. The approved works shall be completed in full in accordance with the LPA written approval prior to occupation of the development

 

5. No development shall take place until details of secure covered cycle parking and/or storage facilities have been submitted to and approved in writing by the Local Planning Authority.  These facilities shall be provided in accordance with the approved details and made available for use prior to the first use of the development hereby permitted and shall be retained for use at all times thereafter.

 

6. The development shall not be occupied until a full Travel Plan (based on the Interim Travel Plan submitted) has been submitted to and approved in writing by the Local Planning Authority. The provisions of the Travel Plan shall be implemented and operated in accordance with the timetable contained therein unless otherwise agreed in writing with the Local Planning Authority.

 

7. No development shall take place until a Site Waste Management Plan, confirming how demolition and construction waste will be recovered and re-used on the site or at other sites, has been submitted to and approved in writing by the Local Planning Authority. The approved Plan shall be implemented in full unless otherwise agreed in writing with the Local Planning Authority.

 

8. Arrangements for the storage and disposal of refuse, and vehicle access thereto, shall be made within the curtilage of the site, in accordance with details previous submitted to and agreed in writing by the Local Planning Authority, prior to the first occupation of the building.

 

9. Surface water drainage works shall be carried out in accordance with the details contained within the submitted Drainage Strategy (July 2016, Reference: LRD28377, Sutcliffe) approved in writing by the Local Planning Authority, in conjunction with the Lead Local Flood Authority.

 

The surface water drainage scheme shall be fully constructed prior to occupation and subsequently in accordance with the timing / phasing arrangements embodied within the approved Drainage Strategy, or within any other period as may subsequently be agreed, in writing, by the Local Planning Authority in consultation with the Lead Local Flood Authority.

 

10. No development shall commence until details of an appropriate management and maintenance plan for the sustainable drainage system for the lifetime of the development have been submitted to the Local Planning Authority, in conjunction with the Lead Local Flood Authority, by the mean of an appropriate legal agreement.

 

Details shall include:

 

i.  the arrangements for adoption by a statutory undertaker or management and maintenance by a Residents’ Management Company

ii.  arrangements concerning appropriate funding mechanisms for its on-going maintenance of all elements of the sustainable drainage system (including mechanical components) and will include elements such as:

 

a.  on-going inspections relating to performance and asset condition assessments

b.  operation costs for regular maintenance, remedial works and irregular maintenance caused by less sustainable limited life assets or any other arrangements to secure the operation of the surface water drainage scheme throughout its lifetime;

  iii.  means of access for maintenance.

 

The plan shall be implemented in accordance with the approved details prior to first occupation of any of the approved dwellings, or completion of the development, whichever is the sooner.  Thereafter the sustainable drainage system shall be managed and maintained in accordance with the approved details.

 

11. Notwithstanding the details shown on the approved plans, a full scheme of hard and soft landscaping shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development. The approved scheme shall be implemented in full prior to first occupation of the site unless otherwise agreed in writing by the Local Planning Authority

 

12. The mitigation measures set out in Section 6 of the submitted Noise and Vibration Assessment (Acoustic & Engineering Consultants Limited, 9 May 2016) shall be implemented in full prior to first occupation and retained as such thereafter

 

13. Notwithstanding the details set out in the Noise and Vibration Assessment (Acoustic & Engineering Consultants Limited, 9 May 2016), a further assessment of vibration levels shall be submitted and approved in writing by the Local Planning Authority. Any conclusions of such a report shall be implemented in full prior to first occupation of the development

 

14. Prior to commencement of development, detailed drawings shall be submitted to and approved by the Local Planning Authority to indicate the finished site and ground floor levels intended at the completion of the development in relation to the existing site levels and the levels of the adjoining land. The development shall be carried out and completed in accordance with the details approved

 

15. Prior to commencement of development full details of ground levels, earthworks and excavations to be carried out near to the railway boundary shall be submitted to and approved in writing by the Local Planning Authority

 

16. Full details of all boundary treatments shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall be implemented in full and retained as such thereafter unless otherwise agreed in writing by the Local Planning Authority

 

17. No development shall commence on site until details of the stopping up of all existing accesses rendered obsolete by the development hereby approved, both pedestrian and vehicular, have been submitted to and approved in writing by the Local Planning Authority.  Such stopping up shall include for all footways to be reinstated to standard footway levels.  The stopping up shall take place in accordance with the approved details prior to the first occupation of the development.

 