Agenda item

APP/17/00171 Heswall Nursery and Allotment Gardens, DEE VIEW ROAD, HESWALL, CH60 0DJ Erection of 3 no. Detached Dwellings with Integral Garages - Amended front window design, additional rear Velux windows & conditions addressed attached to APP/16/00048 [Approved] (Amended plans 22 March 2017)

Minutes:

The Managing Director for Delivery submitted the above application for consideration.

 

On a motion by Councillor D Elderton and seconded by Councillor I Lewis it was:

 

Resolved (13:0) That the application be approved subject to the following conditions:

 

1. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority as amended on the 22 March 2017 and listed as follows: Drawing number 001, 002, 003 and 004 dated 22.03.17

 

2. PRIOR TO FIRST OCCUPATION OF THE DEVELOPMENT details of a scheme for all boundary treatment shall be submitted to and agreed in writing with the Local Planning Authority. The agreed scheme shall be implemented in full and retained as such thereafter unless otherwise agreed in writing with the Local Planning Authority.

 

3. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2008 (or any subsequent Order or statutory provision revoking or re-enacting the provisions of that Order), no garages, outbuildings or other extensions to a dwelling shall be erected unless expressly authorised.

 

4. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2008 (or any subsequent Order or statutory provision re-enacting or revoking the provisions of that Order), no window or dormer window shall be added to the property unless expressly authorised.

 

5. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order) no walls, fences or other means of enclosure shall be erected on any part of the site other than that  approved under Condition 10 below.

 

6. PRIOR TO FIRST OCCUPATION OF THE DWELLINGS full details of soft and hard landscaping shall be been submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall detail the locations, species and heights of all existing and proposed trees, shrubs and hedge planting and all existing and proposed grassed and hard surfaced areas and any other natural or proposed features. The approved scheme shall be implemented in full in the first planting season following first occupation of the dwellings hereby permitted, unless otherwise agreed in writing by the Local Planning Authority.

 

7. Any trees or shrubs removed, dying, being severely damaged or becoming seriously diseased within five years from the completion of the scheme shall be replaced by trees or shrubs of a similar size and species to those originally required to be planted unless otherwise agreed in writing by the Local Planning Authority.

 

8. PRIOR TO THE FIRST OCCUPATION OF THE DWELLINGS arrangements for the storage and disposal of refuse, and vehicle access thereto, shall be made within the curtilage of the site, in accordance with details to be submitted to and agreed in writing by the Local Planning Authority. The approved details shall be implemented in full unless otherwise agreed in writing with the Local Planning Authority.

 

9. The access to the site shall be in accordance with the details shown on the submitted plan, drawing number 001 Revision C dated 22.03.17 with the hedgerow maintained at a height of 1 metre or below and retained as such at all times. 

 

10. PRIOR TO THE OCCUPATION OF THE DWELLINGS a scheme for the disposal of foul and surface water drainage shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall take account that foul water and surface water discharges shall be drained separately from the site.  No surface water shall be allowed to connect, either directly or indirectly, to the public sewerage system and no land drainage run-off shall be permitted to discharge, either directly or directly, to the public sewerage system.  No part of the development shall be brought into use until the drainage system has been constructed and completed in accordance with the approved plans.

 

Supporting documents: