Agenda item

APP/17/00513: Courtyard House, 9 DEE VIEW ROAD, HESWALL, CH60 0DJ : Erection of a Single Storey Dwelling

Minutes:

The Managing Director for Delivery submitted the above application for consideration.

 

On a motion moved by Councillor D Realey and seconded by Councillor Pat Hackett it was:

 

Resolved- (13:0)That the application be approved subject to the following conditions:

 

1. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority as amended on the 2nd May 2017 and listed as follows: Drawing number 003, 004 & 005 (Dated 18.04.2017)

 

2. Prior to first occupation of the development details of a scheme for all boundary treatment shall be submitted to and agreed in writing with the Local Planning Authority. The agreed scheme shall be implemented in full prior to first occupation and retained as such thereafter unless otherwise agreed in writing with the Local Planning Authority.

 

3. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2008 (or any subsequent Order or statutory provision revoking or re-enacting the provisions of that Order), no garages, outbuildings or other extensions to a dwelling shall be erected unless expressly authorised.

 

4. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2008 (or any subsequent Order or statutory provision re-enacting or revoking the provisions of that Order), no window or dormer window shall be added to the property unless expressly authorised.

 

5. No development shall take place, including any works of demolition, until a Construction Method Statement has been submitted to and approved in writing by the Local Planning Authority.  The approved Statement shall be adhered to throughout the construction period. 

 

The Statement shall provide for:

 

i.  the parking of vehicles of site operatives and visitors;

ii.  loading and unloading of plant and materials;

iii.  storage of plant and materials used in constructing the development;

iv.  the erection and maintenance of security hoarding including decorative displays and facilities for public viewing, where appropriate;

v.  wheel washing facilities;

vi.  measures to control the emission of noise, dust and dirt during construction;

vii.  a scheme for recycling/disposing of waste resulting from demolition and construction works.

 

6. Prior to first occupation of the dwellings full details of soft and hard landscaping shall be been submitted to and approved in writing by the Local Planning Authority. The landscaping scheme shall detail the locations, species and heights of all existing and proposed trees, shrubs and hedge planting and all existing and proposed grassed and hard surfaced areas and any other natural or proposed features. The approved scheme shall be implemented in full in the first planting season following first occupation of the dwellings hereby permitted, unless otherwise agreed in writing by the Local Planning Authority.

 

7. Any trees or shrubs removed, dying, being severely damaged or becoming seriously diseased within five years from the completion of the scheme shall be replaced by trees or shrubs of a similar size and species to those originally required to be planted unless otherwise agreed in writing by the Local Planning Authority.

 

8. The access to the site shall be in accordance with the details shown on the submitted plan, drawing number 001 Revision C dated 22.03.17 with the hedgerow maintained at a height of 1 metre or below and retained as such at all times. 

 

9. The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission.

 

10. Prior to the commencement of any development, a surface water drainage scheme, based on the hierarchy of drainage options in the National Planning Practice Guidance with evidence of an assessment of the site conditions shall be submitted to and approved in writing by the Local Planning Authority. The surface water drainage scheme must be in accordance with the Non-Statutory Technical Standards for Sustainable Drainage Systems (March 2015) or any subsequent replacement national standards.

 

11. Before any construction commences, samples of the facing, roofing & window materials to be used in the external construction of this development shall be submitted to and approved in writing by the Local Planning Authority. The approved materials shall then be used in the construction of the development.

 

 

Supporting documents: