APP/17/01092: ALEXANDER HALL, ROCKY LANE, HESWALL, CH60 0BY: Demolition of the Alexander Hall and erection of ten apartments - amendments to Approved Proposal, APP/16/00024 & Approved Proposal APP/15/00718 including amendments to lift shafts, window style & internal alterations, conditions attached to APP/16/00024 addressed.

Minutes:

The Managing Director for Delivery submitted the above application for consideration.

 

On a motion moved by Councillor D Elderton and seconded by Councillor S Foulkes it was:

 

Resolved (12-1 Absent) That the application be approved subject to the following conditions:

 

1. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority and listed as follows: 002 Rev H (11.09.2017) 003 Rev J (21.11.2017) 004 Rev H (11.09.2017) 005 Rev J (21.11.2017) 006 Rev J (21.11.2017) & 008 Rev J (12.12.2017)

 

2. The site shall be suitably landscaped in accordance with a scheme to be submitted to and approved by the Local Planning Authority within three months of the date of approval, the scheme shall include details of planting types, heights, soft and hard landscaping, the landscape work shall be completed during the first available planting season following completion of the development hereby approved and shall be maintained thereafter to the satisfaction of the Local Planning Authority.

 

3. Within three months of the date of approval a plan indicating the positions, design, materials and type of boundary treatment to be erected has been submitted to and approved in writing by the Local Planning Authority. The boundary treatment shall be completed in accordance with the approved details within three months of the date of the approval of details by the Local Planning Authority.

 

4. Within three months of the date of approval details of the space and facilities for cycle parking shall be submitted to and agreed in writing by the Local Planning Authority. The cycle parking shall be completed in accordance with the approved details within three months of the date of the approval of details by the Local Planning Authority and shall be permanently retained thereafter.

 

5. Foul water and surface water discharges shall be drained separately from the site.

 

6. Within three months of the date of approval a surface water drainage scheme based on the hierarchy of drainage options in the NPPG with evidence of an assessment of the site conditions shall be submitted to and approved in writing by the LPA. The surface water drainage scheme must be in accordance with the non-statutory technical standards for sustainable drainage systems (March 2015) or any subsequent replacement national standards and unless otherwise agreed in writing by the LPA, no surface water shall discharge to the public sewer either directly or indirectly. The scheme shall be carried out in accordance with the approved details.

 

7. Within three months of the date of approval arrangements for the storage and disposal of refuse, and vehicle access thereto, shall be made within the curtilage of the site, in accordance with details to be submitted to and agreed in writing by the Local Planning Authority. The approved details shall be implemented in full within three months of the date of the approval of details unless otherwise agreed in writing with the Local Planning Authority.

 

8. Within 3 months of the date of approval, the windows to the west facing elevation of Flat A10 as shown on plan 004, shall be fitted with fixed and obscure glazing up to a height of 1.7m from the finished first floor internal floor level and shall be permanently retained in that condition thereafter.

 

9.  The outer area of Flat A07 as shown on plan 003 received 21 November 2017 shall not be used as a balcony at any time and the internal screen shall remain in situ to prevent stepping out or use of the external area.