Agenda item
APP/18/01085: Erection of new detached dwelling - Land between 36 & 52/54 Stanley Lane, Eastham, CH62 0AG
Minutes:
The Corporate Director for Economic and Housing growth submitted the above application for consideration.
Following publication of the agenda, an additional condition as proposed as follows:
“Before any equipment, machinery or materials are brought onto site, a 1
metre high fence or other barrier as agreed in writing with the Local
Planning Authority, shall be erected around the outer limit of the crown
spread of all trees, hedges or woodlands shown to be retained on the
approved plan. Such fencing shall be maintained in a satisfactory manner
until the development is completed. During the period of construction, no
material shall be stored, fires started or trenches dug within these
enclosed areas without the prior consent in writing of the Local Planning
Authority.”
On a motion by Councillor George Davies and seconded by Councillor David Elderton it was:
Resolved (11:0) That the application be approved subject to the following conditions:
1. The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission.
|
2. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority on 13th December2018 and listed as follows: EVA650-0316-R Revision 3
|
3. Prior to the commencement of any building works above ground level, samples of the materials to be used in the external construction of this development shall be submitted to and approved in writing by the Local Planning Authority. The approved materials shall then be used in the construction of the development.
|
4. Prior to the commencement of any building works above ground level, full details of the hard and soft landscaping of the site shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in full prior to first occupation of the proposal and shall be retained as such thereafter unless otherwise agreed in writing by the Local Planning Authority.
|
5. Prior to the commencement of any building works above ground level, full details of all proposed boundary treatment shall be submitted to and approved in writing by the Local Planning Authority. Any boundary treatment shall subsequently be in accordance with the approved scheme unless otherwise agreed in writing by the Local Planning Authority
|
6. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any subsequent Order or statutory provision revoking or re-enacting the provisions of that Order), no garages, outbuildings or other extensions to the dwelling shall be erected unless expressly authorised.
|
7. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order) no new walls, fences or other means of enclosure shall be erected on any part of the land lying between any main wall of the building fronting a highway and the highway boundary.
|
8. Prior to the commencement of any building works above ground level, details of the timber windows and doors (including elevation drawings at a scale of 1:20 and vertical and horizontal cross sections at a scale 1:5 or 1:2 to indicate their profile) shall be submitted to and approved in writing by the Local Planning Authority. The approved details shall then be used in the construction of the development
|
9. All rooflights within the development hereby permitted shall be conservation rooflights unless otherwise agreed in writing by the Local Planning Authority
|
10. Before any equipment, machinery or materials are brought onto site, a 1 metre high fence or other barrier as agreed in writing with the Local Planning Authority, shall be erected around the outer limit of the crown spread of all trees, hedges or woodlands shown to be retained on the approved plan. Such fencing shall be maintained in a satisfactory manner until the development is completed. During the period of construction, no material shall be stored, fires started or trenches dug within these enclosed areas without the prior consent in writing of the Local Planning Authority.
|
Supporting documents: