Agenda item

APP/18/01422: SANDHEY ROAD, MEOLS, CH47 5AX - Erection of two 2-bedroom detached bungalows (amended plans received 12/02/2019)

Minutes:

  Councillors D Elderton, I Lewis and M Jordan declared personal and prejudicial interests in this matter and left the room during its consideration (minute 129 refers).

 

The Corporate Director for Economic and Housing Growth submitted the above application for consideration.

 

On a motion by Councillor R Abbey and seconded by Councillor T Jones it was -

 

Resolved (10:0) – That the application be approved subject to the following conditions:

 

The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission.

 

The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority on 12 February 2019 and listed as follows:

 

CROSS/18/01/003e (Plot 1 Plans and Elevations) dated January 2019

CROSS/18/01/005e (Site Plan) dated January 2019.

 

No development above ground floor slab level shall take place until samples of the materials to be used in the external walling and roofing finishes of the development hereby approved have been made available on site and approved in writing by the Local Planning Authority. Thereafter development shall be carried out as approved.

 

No dwelling shall be occupied until a detailed scheme for landscaping has been submitted to and approved in writing by the Local Planning Authority. Such scheme shall demonstrate the location and type of hard and soft surfacing materials and the location, design and height above ground level of any retained or proposed gates, walls, fences or other forms of enclosure to the site boundaries or within the site. Thereafter development shall be carried out as approved.

 

No development shall take place until a Construction Management Plan has been submitted to and approved in writing by the Local Planning Authority. Thereafter the approved plan shall be adhered to throughout the construction period. The plan shall provide for the following:

 

i) Location(s) for the parking of vehicles of site operatives and visitors clear of the public highway;

ii) Location(s) for the loading and unloading of plant and materials;

iii) Location(s) for the storage of plant and materials used in construction of the development;

iv) Measures to control the emission of noise, vibration and dust during construction;

v) Construction phase delivery and working hours not to exceed 08:00 to 18:00 Monday to Friday, 08:00 to 13:00 on Saturday and not at all on Sunday or public holidays.

 

With the exception of the windows to the south east side elevation of plot 2 overlooking Queens Park, no dwelling shall be occupied until:

 

i) all windows to the north west and south east side elevations have been fitted with glazing obscured to at least level 3 of the Pilkington scale of privacy; or

ii) fences have been erected to the north western and south eastern side boundaries of plot 1 of at least 1.8 metres in height above external ground level for the distance between the front elevation of plot 1 and the rear boundary of the application site.

 

Thereafter development shall be carried out as approved and retained as such.

 

The site shall be developed with separate systems of drainage for foul and surface water.

 

No foundations shall be poured/installed until detailed drawings have been submitted to and approved in writing by the Local Planning Authority demonstrating the finished site and ground floor levels intended at the completion of the development in relation to the existing site levels and the levels of the adjoining land. Thereafter development shall be carried out as approved.

 

Supporting documents: