Agenda item

APP/19/00132: Land at Delamere Avenue, Eastham, Wirral, CH62 9ED - Erection of 6 new houses and 6 new apartments with car parking along with access road

Minutes:

  Councillor S Foulkes declared a prejudicial interest in this matter and left the room during its consideration (minute 141 refers).

 

Vice Chair in the Chair.

 

The Corporate Director for Economic and Housing Growth submitted the above application for consideration.

 

On a motion by Councillor G Davies and seconded by Councillor D Elderton it was –

 

Resolved (11:0) – That the application be approved subject to the following conditions:

 

1. The development hereby permitted shall be begun before the expiration of 3 years from the date of this permission.

 

2. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority on 28th January 2019 and listed as follows: 1887-00A; 1887-07D; 1887-08D; 1887-09C

 

3. Before any construction above ground level commences, samples of the materials to be used in the external construction of this development shall be submitted to and approved in writing by the Local Planning Authority. The approved materials shall then be used in the construction of the development.

 

4. No development shall commence until the final detailed sustainable drainage design, for the management and disposal of surface water from the site,  demonstrating compliance with the discharge hierarchy and in accordance with the principles identified in the following preliminary documents, including but not limited to a restricted discharge rate of 5 l/s and the offering of all communal elements of the surface water drainage system for adoption by United Utilities at adoptable standards,  has been submitted to and approved in writing by the Local Planning Authority, in consultation with the Lead Local Flood Authority:

 

·  Drainage Strategy and Flood Risk Assessment (Delamere Avenue, Eastham, Wirral/ CL8198/ SWF Consultants)

·  Proposed Drainage Layout (07.11.18/ rev A/ Drawing Number CL8198-01/ SWF Consultants)

 

5. The development hereby permitted by this planning permission, including all components of the sustainable drainage system, shall be carried out in accordance with the approved final Sustainable Drainage Strategy, including any phasing embodied within, and maintained in perpetuity in accordance with an agreed Operation and Maintenance Plan, to be submitted for each development phase, approved by the Local Planning Authority, in consultation with the Lead Local Flood Authority.

 

The approved drainage scheme shall be fully constructed prior to occupation in accordance with the approved details, phasing and timetable embodied within the approved final Sustainable Drainage Strategy, or within any other period as may subsequently be agreed, in writing, by the Local Planning Authority in consultation with the Lead Local Flood Authority.  ‘As built’ drainage design/layout drawings and a final Operation and Maintenance Plan, confirming asset details and maintenance arrangements, shall be submitted to the Lead Local Flood Authority, in accordance with any approved phasing, prior to occupation.

 

6. No development shall take place until a full scheme of works and timetable for the construction of the new highways and/or amendment of the existing highway made necessary by this development, including new carriageways, footways, footpaths, street lighting, surface water drainage, traffic signs, TROs, road markings, tactile paved pedestrian crossings, street furniture, access onto the adjacent highway has been submitted to and agreed in writing with the Local Planning Department. The approved works shall be completed in accordance with the LPA written approval prior to occupation of the development

 

7. The development shall not be occupied until a scheme for the provision of affordable housing as part of the development has been submitted to and approved in writing by the local planning authority. The affordable housing shall be provided and retained, unless otherwise agreed in writing with the Local Planning Authority in accordance with the approved scheme. The scheme shall include:

 

1) The numbers, type, tenure and location of the site of the affordable housing provision to be made:

2) The timing of the construction of the affordable housing;

3) The occupancy criteria to be used for determining the identity of prospective and successive occupiers of the affordable housing and the means by which such occupancy can be enforced.

 

8. Prior to the commencement of any building works above ground level, full details of the hard and soft landscaping of the site (including all boundary treatment) shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in full prior to first occupation of the proposal and shall be retained as such thereafter unless otherwise agreed in writing by the Local Planning Authority.

 

9. NO DEVELOPMENT SHALL TAKE PLACE until details of secure covered cycle parking and/or storage facilities have been submitted to and approved in writing by the Local Planning Authority.  These facilities shall be provided in accordance with the approved details and made available for use prior to the first use of the development hereby permitted and shall be retained for use at all times thereafter.

 

10. PRIOR TO FIRST OCCUPATION OR USE OF THE DEVELOPMENT, arrangements for the storage and disposal of refuse including recycling facilities, and vehicle access thereto, shall be made within the curtilage of the site, in accordance with details previous submitted to and agreed in writing by the Local Planning Authority, prior to the first occupation of the building.

 