Agenda item
RVC/22/01426; The Beacon Project Albert Road, Hoylake, Wirral, CH47 2AB, Variation of Condition 8 and 12 of previously approved APP/19/00065
Minutes:
The Development Management Manager presented the report of the Director of Regeneration and Place in relation to the above application for consideration.
On a motion by Councillor Kathy Hodson and seconded by Councillor Steve Foulkes it was –
Resolved (11:1) – that the application be approved subject to the following conditions.
1. The development hereby permitted shall begin not later than 3 years from the date of this decision.
2. No development involving the use of any facing materials shall take place until samples of the materials to be used in the construction of external surfaces of the building have been submitted to and approved in writing by the Local Planning Authority. Development shall be carried out in accordance with the approved details.
3. No development shall commence until the final detailed sustainable drainage design1, for the management and disposal of surface water from the site based on the principles and details identified in the following documents has been submitted to and approved in writing by the Local Planning Authority, in consultation with the Lead Local Flood Authority: · Drainage Strategy and Flood Risk for Proposed Development The Beacon, Albert Road, Hoylake, Wirral (July 2018 rev 03 /LRD29750/Sutcliffe)
4. Prior to the occupation of any properties, a completed Operation and Maintenance Plan with appended as-built drawings must be submitted to and approved in writing by the Local Planning Authority in consultation with Lead Local Flood Authority along with evidence of arrangements to secure funding and maintenance of the sustainable surface water drainage system for the lifetime of the development through an appropriate legally binding agreement. The approved Operation and Maintenance Plan shall be implemented prior to first occupation of any of the approved dwellings, or completion of the development, whichever is the sooner. (Details submitted DIS/22/00911)
5. A suitable scheme of fume extraction shall be submitted in writing to and approved by the Local Planning Authority prior to any building/renovation work commencing. When designing the fume extraction system reference should be made to the Defra document: Guidance on the Control of Odour and Noise from Commercial Kitchen Exhaust Systems
6. The ground floor commercial premises shall not be used except between the hours of :- 08:00 hours and 22:00 hours Mondays to Thursday 08:00 hours and 11:30 hours Friday and Saturdays 10:00 hours and 22:00 on Sundays and Bank Holidays without the written consent of the Local Planning Authority.
7. The development hereby permitted shall be carried out in accordance with the approved plans received by the local planning authority on 31st January 2018 and listed as follows: 02-02-000, 02-02-001, 02-02-002, 02-02-003, 02-02-004, 02-03-000, 02-03-000, 02-03-001,02-03-002,02-05-004,02-05-004,02-05-003,02-05-002,02-05-001,
8. NO DEVELOPMENT SHALL TAKE PLACE until details of secure covered cycle parking and/or storage facilities have been submitted to and approved in writing by the Local Planning Authority. These facilities shall be provided in accordance with the approved details and made available for use prior to the first use of the development hereby permitted and shall be retained for use at all times thereafter.
9. Prior to the commencement of development a Construction Management Plan shall be submitted to and approved in writing by the Local Planning Authority. The provisions of the Construction Management Plan shall be implemented in full during the period of construction and shall not be varied unless otherwise agreed in writing with the Local Planning Authority.
10. No development shall take place until a Site Waste Management Plan, confirming how demolition and construction waste will be recovered and re-used on the site or at other sites, has been submitted to and approved in writing by the Local Planning Authority. The approved Plan shall be implemented in full unless otherwise agreed in writing with the Local Planning Authority.
11. Prior to the first occupation of the dwellings arrangements for the storage and disposal of refuse including recycling facilities, and vehicle access thereto, shall be made within the curtilage of the site, in accordance with details to be submitted to and agreed in writing by the local planning authority. The approved details shall be implemented in full unless otherwise agreed in writing with the local planning authority.(submitted DIS/22/00911)
12. The proposed development shall be carried out in accordance with the phasing plan received by the Local Planning Authority on 1 September 2022 (Phasing Plan March 2019 Rev A) unless otherwise agreed in writing with the Local Planning Authority.
13. Development shall not be commenced until a Travel Plan has been submitted to and approved in writing by the Local Planning Authority. The provisions of the Travel Plan shall be implemented and operated in accordance with the timetable contained therein unless otherwise agreed in writing with the Local Planning Authority.
(Details submitted DIS/22/00911)
Supporting documents: