Forward Plan

June to September 2022  (01/06/2022 to 30/09/2022, Policy and Resources Committee)

Plan items
No. Item

1.

Application for Financial Assistance

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 08/02/2017

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

2.

Wirral Waters Enterprise Zone Investment Fund

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Originally due:   1 May 2021

Notice of proposed decision first published: 18/12/2015

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

3.

Liverpool City Region Economic Initiatives and Funding

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/08/2017

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

4.

Birkenhead Town Centre Masterplan

Decision maker:  Economy Regeneration & Housing Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 10/02/2015

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

5.

Hind Street Movement Strategy

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 28/01/2021

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

6.

Hind Street Regeneration Framework

Decision maker:  Economy Regeneration & Housing Committee, Policy and Resources Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 02/08/2019

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

7.

Hind Street Infrastructure Relocations New!

Decision maker:  Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/05/2022

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

8.

Appointment of Preferred Developer to Deliver the New Ferry Regeneration Masterplan and Authority to Commence a Compulsory Purchase Order

Decision maker:  Economy Regeneration & Housing Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 01/05/2020

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

9.

Spatial Framework for the Borough

Decision maker:  Economy Regeneration & Housing Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Originally due:   1 Jan 2023

Notice of proposed decision first published: 02/08/2018

10.

Wirral Growth Company Final Site Development Plans for Moreton

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 28/01/2021

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

11.

Wirral Growth Company - Final Site Development Plans for Bromborough

Decision maker:  Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 31/01/2022

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

12.

Investment Plan

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 28/01/2021

13.

Active Travel Strategy

Decision maker:  Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 28/01/2021

14.

Mass Transit

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 28/01/2021

15.

Liverpool City Region Cycling Walking Investment Plan - Birkenhead to New Brighton

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Originally due:   1 Sep 2022

Notice of proposed decision first published: 04/10/2019

16.

Liverpool City Region Transport Initiatives and Funding

Decision maker:  Director of Neighbourhood Services, Policy and Resources Committee, Economy Regeneration & Housing Committee, Director of Regeneration and Place, Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 31/01/2022

17.

Liveable Neighbourhoods

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Originally due:   1 May 2022

Notice of proposed decision first published: 28/01/2021

18.

Parking Strategy

Decision maker:  Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 07/04/2021

19.

Electric Vehicle Strategy

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 31/01/2022

20.

Future High Streets Fund Projects

Decision maker:  Economy Regeneration & Housing Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 07/04/2021

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

21.

Dock Branch Neighbourhood and Park

Decision maker:  Economy Regeneration & Housing Committee, Director of Regeneration and Place, Policy and Resources Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/04/2022

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

22.

Birkenhead Waterfront

Decision maker:  Policy and Resources Committee, Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/04/2022

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

23.

Towns / High Street Funding Initiatives

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/05/2021

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

24.

Wirral Waters, Dock Road, Wallasey

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/05/2021

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

25.

Freeports and Maritime Innovation & Growth Projects

Decision maker:  Economy Regeneration & Housing Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/09/2021

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

26.

Active Travel Funding

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/09/2021

27.

Submission of Outline Business Case for Homes England Funding

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/09/2021

28.

St Werburgh's Masterplan and Delivery Strategy

Decision maker:  Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/04/2022

29.

Former House of Fraser Site (part) - Appointment of Residential Developer Partner

Decision maker:  Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/04/2022

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

30.

Levelling Up Fund

Decision maker:  Economy Regeneration & Housing Committee, Policy and Resources Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Originally due:   1 Dec 2022

Notice of proposed decision first published: 07/12/2021

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

31.

Development of a New Market for Birkenhead

Decision maker:  Economy Regeneration & Housing Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/04/2022

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

32.

Liscard Delivery Masterplan New!

Decision maker:  Economy Regeneration & Housing Committee

Decision due:   Between 1 Aug 2022 and 30 Nov 2022

Notice of proposed decision first published: 03/05/2022

33.

New Brighton Neighbourhood Framework and Marine Promenade Masterplan New!

Decision maker:  Economy Regeneration & Housing Committee

Decision due:   Between 1 Aug 2022 and 30 Nov 2022

Notice of proposed decision first published: 03/05/2022

34.

Sport City Wirral and Solar Campus, Leasowe New!

Decision maker:  Economy Regeneration & Housing Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/05/2022

35.

Public Toilet Consultation Outcomes New!

Decision maker:  Economy Regeneration & Housing Committee, Tourism, Communities, Culture & Leisure Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/05/2022

36.

Highway Maintenance Term Service Contracts Review and Re-Procurement

Decision maker:  Director of Neighbourhood Services, Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 01/10/2020

37.

Wallasey Embankment Reinforcement - Acceptance of Grant

Decision maker:  Director of Neighbourhood Services, Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 07/07/2020

38.

Acceptance of Tenders for Highway Services Contracts ('A' Contracts)

Decision maker:  Environment, Climate Emergency and Transport Committee, Director of Neighbourhood Services

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/08/2021

39.

Acceptance of Tenders for Civil and Highways Consultancy Support 2021/23

Decision maker:  Director of Neighbourhood Services, Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/08/2021

40.

Car Parking Charges Options

Decision maker:  Policy and Resources Committee, Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Nov 2022 and 28 Feb 2023

Notice of proposed decision first published: 05/03/2021

41.

Highways Structural Maintenance Programme 2022/23 - Confirmation of Funding and Programmes

Decision maker:  Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Nov 2022 and 28 Feb 2023

Notice of proposed decision first published: 03/03/2022

42.

Tender Acceptance and Design Approval of Sustainable Urban Development (SUD) Green Travel Corridor Phase 5 - Beaufort Road / Wallasey Bridge Road

Decision maker:  Assistant Director: Highways and Infrastructure, Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 28/01/2021

43.

Grant Funding Agreement - Liverpool City Region (LCR) Traffic Signal LED Upgrade New!

Decision maker:  Assistant Director: Highways and Infrastructure

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/05/2022

44.

Tree Strategy Tree Supplier

Decision maker:  Director of Neighbourhood Services

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 31/01/2022

45.

Liverpool City Region Enabling Powers and Associated Issues

Decision maker:  Policy and Resources Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 08/06/2018

46.

Wirral Local Plan 2021 to 2037: Publication of Submission Draft Plan (Regulation 19) and Submission to Secretary of State for Examination (Regulation 22)

Decision maker:  Policy and Resources Committee, Council

Decision due:   Between 1 Sep 2022 and 31 Dec 2022

Notice of proposed decision first published: 07/04/2021

47.

Strategic Asset Acquisitions

Decision maker:  Policy and Resources Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 01/09/2017

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

48.

Property and Land Disposals

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee, Policy and Resources Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/08/2021

49.

Loan / Loan Facility Application

Decision maker:  Director of Resources, Policy and Resources Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/10/2019

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

50.

Edsential Update and Finance

Decision maker:  Policy and Resources Committee, Director of Resources

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 28/01/2021

51.

Strategic Change Programme

Decision maker:  Policy and Resources Committee, Director of Resources

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/05/2021

Anticipated restriction: Open  -

52.

Discretionary Rate Relief Policy

Decision maker:  Policy and Resources Committee

Decision due:   Between 1 Sep 2022 and 31 Dec 2022

Notice of proposed decision first published: 07/12/2021

53.

Financial Support Packages New!

Decision maker:  Policy and Resources Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/05/2022

54.

Enterprise Resource Planning (ERP) - SmartBusiness

Decision maker:  Director of Resources, Policy and Resources Committee

Decision due:   Between 1 Sep 2022 and 31 Dec 2022

Notice of proposed decision first published: 07/12/2021

55.

Community Asset Transfer Capital Funding

Decision maker:  Policy and Resources Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/03/2022

56.

Council Improvement Plan

Decision maker:  Policy and Resources Committee, Council

Decision due:   Between 1 Sep 2022 and 31 Dec 2022

Notice of proposed decision first published: 03/03/2022

57.

Wirral Plan Refresh

Decision maker:  Policy and Resources Committee, Council

Decision due:   Between 1 Sep 2022 and 31 Dec 2022

Notice of proposed decision first published: 04/04/2022

58.

Financial Monitoring Outturn 2021/22

Decision maker:  Policy and Resources Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/03/2022

59.

Capital Programme Amendments 2022/23 New!

Decision maker:  Policy and Resources Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/05/2022

60.

Treasury Management New!

Decision maker:  Policy and Resources Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Originally due:   1 Jul 2022

Notice of proposed decision first published: 03/05/2022

61.

Treasury Management Annual Report New!

Decision maker:  Policy and Resources Committee

Decision due:   Between 1 Sep 2022 and 31 Dec 2022

Notice of proposed decision first published: 03/05/2022

62.

Approval for Compulsory Purchase Order for Land at Trafalgar Road, Wallasey

Decision maker:  Director of Regeneration and Place, Economy Regeneration & Housing Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 07/12/2021

63.

Housing Growth Strategy - Delivering for Wirral

Decision maker:  Economy Regeneration & Housing Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 06/03/2020

64.

Central Government Housing Infrastructure Funding

Decision maker:  Economy Regeneration & Housing Committee, Director of Regeneration and Place

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 07/12/2018

Anticipated restriction: Fully exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

65.

Children's Residential Transformation Programme

Decision maker:  Director of Children, Families and Education, Children, Young People & Education Committee

Decision due:   Between 1 Jun 2022 and 30 Sep 2022

Notice of proposed decision first published: 28/01/2021

66.

Procurement of Services to Encourage, Enable and Assist Young People to Participate in Employment, Education and Training

Decision maker:  Children, Young People & Education Committee, Director of Children, Families and Education

Decision due:   Between 1 Aug 2022 and 30 Nov 2022

Lead officer:  Paul Smith

Notice of proposed decision first published: 17/09/2021

67.

Establishment of a Youth Partnership

Decision maker:  Director of Children, Families and Education, Children, Young People & Education Committee

Decision due:   Between 1 Aug 2022 and 30 Nov 2022

Notice of proposed decision first published: 01/10/2021

68.

Children Looked After and Care Leavers Strategy

Decision maker:  Children, Young People & Education Committee, Director of Children, Families and Education

Decision due:   June 2022

Notice of proposed decision first published: 29/10/2021

69.

Community Asset Transfer

Decision maker:  Tourism, Communities, Culture & Leisure Committee, Director of Neighbourhood Services

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/03/2022

70.

West Kirby Marine Lake

Decision maker:  Environment, Climate Emergency and Transport Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 28/01/2021

71.

Libraries Strategy and New Model (Update)

Decision maker:  Tourism, Communities, Culture & Leisure Committee, Director of Neighbourhood Services

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 07/04/2021

72.

Facilities Investment Strategy (Leisure)

Decision maker:  Tourism, Communities, Culture & Leisure Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/03/2022

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

73.

Neighbourhoods Budget Consultation Outcomes New!

Decision maker:  Tourism, Communities, Culture & Leisure Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/05/2022

74.

Community Safety New!

Decision maker:  Tourism, Communities, Culture & Leisure Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/05/2022

75.

Grass Roots Football (Update)

Decision maker:  Director of Neighbourhood Services, Tourism, Communities, Culture & Leisure Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 07/04/2021

76.

The Development of Golf and New Operating Model

Decision maker:  Director of Neighbourhood Services, Tourism, Communities, Culture & Leisure Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 04/05/2021

77.

All Age Disability New!

Decision maker:  Adult Social Care and Public Health Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/05/2022

78.

Commissioning Activity Q2

Decision maker:  Adult Social Care and Public Health Committee

Decision due:   Between 1 Jul 2022 and 31 Oct 2022

Notice of proposed decision first published: 03/03/2022

79.

Addiction, Diversion, Disruption, Enforcement and Recovery (ADDER) Programme

Decision maker:  Adult Social Care and Public Health Committee

Decision due:   September 2022

Notice of proposed decision first published: 04/04/2022

Anticipated restriction: Part exempt  - view reasons

Explanation of anticipated restriction:
Due to commercially sensitive information

80.

CVF Working Together Plan and Business Case

Decision maker:  Adult Social Care and Public Health Committee

Decision due:   Between 1 Apr 2023 and 31 Jul 2023

Notice of proposed decision first published: 03/03/2022

81.

Community Connector Programme New!

Decision maker:  Adult Social Care and Public Health Committee

Decision due:   Between 1 Aug 2022 and 30 Nov 2022

Notice of proposed decision first published: 03/05/2022

82.

Information and Advice New!

Decision maker:  Adult Social Care and Public Health Committee

Decision due:   Between 1 Aug 2022 and 30 Nov 2022

Notice of proposed decision first published: 03/05/2022